Skip to main content

What we do

Our Services

Design-build remodeling across Lincoln & Southeast Nebraska. Kitchens, bathrooms, basements, decks and whole-home renovations. Whether it's a small update or starting from square one, we strive to make the process seamless while delivering exceptional results.

  • Licensed & insured

    Reg #77532-26 · Fully insured — $2M general liability

  • Locally owned & operated

    Building in Lincoln since 2026

Common questions

Before you call anyone

The questions we get asked most often, answered honestly.

How much does a remodel actually cost?

Honest ranges for the Lincoln area, based on what we actually build:

Project Typical range
Kitchen remodel $30,000 – $120,000
Powder room $10,000 – $20,000
Primary bath suite $15,000 – $60,000
Basement finishing $55 – $95 / sq ft
Home addition $350 – $550 / sq ft
Whole-home renovation $180 – $400 / sq ft

The spread within each range is mostly driven by three things: whether structural work is involved, whether mechanical systems need replacing, and the cabinetry tier.

What we won’t do is give you a number with vague allowances buried in it. If we budget $8,000 for tile, we’ll show you what $8,000 of tile looks like before you sign.

Are you licensed and insured?

Yes, and we’ll hand you the paperwork before you ask.

  • Nebraska contractor registration — number listed in the footer of this site and on every proposal
  • $2,000,000 general liability coverage

Worth knowing how this works in Nebraska: the state does not issue a general contractor licence the way some states do. Contractors register with the Department of Labor, and individual trades like electrical, plumbing, and mechanical are licensed separately. Anyone telling you they hold a “Nebraska general contractor licence” is describing something that does not exist.

If you have questions about coverage on your particular project, get in touch and Owen will walk you through it.

How long will my project take?

Two separate clocks, and people usually only think about the second one.

Before construction (4–10 weeks): design, materials selection, ordering, and permitting. We deliberately complete materials selection and get everything delivered to our warehouse before demolition begins. It feels slow. It’s the single biggest reason our projects finish on schedule.

On site:

  • Bathroom — 2 to 8 weeks
  • Kitchen — 4 to 14 weeks
  • Basement — 8 to 16 weeks
  • Addition — 4 to 9 months from design to move-in
  • Whole home — 6 to 12 months

You get a written schedule with named milestones at contract signing, re-issued every Friday with actual progress marked against it.

What other work do you take on?

The five services listed on this site are the projects we take on most often, but they are not the whole list.

  • Window replacement — often a single-weekend job, including whole-home replacements
  • Tile work — floors, showers and backsplashes, as a standalone project or part of a larger remodel
  • Smaller interior and exterior projects that do not amount to a full remodel

The same person quotes your job, does the work and answers the phone afterwards, whether it is a full kitchen or a single room. If you are not sure whether your project is a fit, get in touch — it is a short conversation either way.

Let’s talk about your project

Book a free in-home consultation. You’ll get honest feedback on what’s possible, a realistic budget range, and a written estimate — with no obligation.

  • Free consultation
  • Written estimate
  • No obligation